Automatic Cellophane Overwrapping Machine|Bopp Film Box Wrapper Supplier

  • Brand:Gelgoog Machinery
  • PAY METHOD:WEST UNION L/C T/T CASH
  • Warranty Time:12 Months
  • Country Of Origin:China
  • Application:1. Multi-function digital frequency inverter,stepless variable speed; 2. Convenient mould replacement, flexible; 3. With automatic feeder, automatic counting, etc
  • Feature
  • Technical Data
  • FAQ
Application of Automatic BOPP Film Cellophane Overwrapping Machine
This machine is mainly suitable for outer film package of pharmaceutical, food, health care products, cosmetics, audio-visual products, and other square appearance decoration items, such as medicine boxes, chewing gum, tea box, sugar box, condoms, mosquito-repellent incense, cigarette packs, tape, VCD discs (CDS), playing cards, transparent soap, square batteries, playing an important role in anti-fake and moistureproof, at the smae time, improving product class, increasing products added value. This device can match with cartoning machine for joint production.
Automatic Box Cellophane Overwrapping Machine
Features Of Automatic Cellophane Overwrapping Machine Supplier
1. The structure is compact and reasonable, advanced stable performance, convenient operation and maintenance;
2. Adopt multi-function digital frequency inverter, and stepless variable speed;
3. The mould replacement is convenient, flexible;
4. With automatic feeder, automatic counting, etc;
5. The driving part is equipped with all kinds of protection devices and fault prompt;
6. Equipped with commissioning the clutch of film, do not waste packing material.
Cellophane Overwrapping Machine for Boxes
After-sales Service Commitment:
1. Suppliers factory inspection: Each box overwrapping machine shall be tested by professional quality inspectors before it leaves the factory. Only when it is qualified can it be delivered.
2. Product transportation: After delivery, the transportation unit ensures safe delivery to the place designated by the customer.
3. After-sales service:
A) Commissioning and installation: After the product enters the designated place of the customer, the factory will reply within 24 hours after the customer has prepared the required materials and informed our factory. The debugger will reach the location of the machine within 24 hours. If the transportation is inconvenient or the journey is long, our factory staff will arrive within 72 hours. And debug the product.
B) Operation training: The debugger shall train the customer's operator until the operator can operate independently.
C) On-site maintenance: After the customer finds the product is out of order and notifies our factory, our factory will give a reply within 24 hours. If you need to replace the parts, our factory will arrange to send the parts to the customer as soon as possible, and guide the replacement and installation by telephone or other means. In case of on-site maintenance, the maintenance personnel of our factory will reach the location of the machine within 24 hours at the soonest. If the traffic is inconvenient or the road is long, the maintenance staff of box cellophane wrapping machine manufacturers will arrive within 72 hours.
4. One year warranty, lifetime maintenance, repair and replacement of spare parts only free of time.
 
This box overwrapping machine can customzied according to customer requirements for different specification.

Model GG-BTB-300A
Packaging material film and gold tear tape
Packing speed 40~80 boxes/min
Max.package size (L)240*(W)120*(H)60mm
Power 220V 50Hz  5kw
Machine weight 500kg
Machine dimensions (L)2000*(W)700*(H)1400mm

Q: Can this cellophane wrapping machine wrap various specifications?
A: yes, if you want 400A type, equipment, you can pack box width within 200mm, for example 50mm, 100 mm, 150 mm, 180mm and so on to meet your packing requirement.
 
Q: How to buy your equipment?
A: If you confirm to buy our equipment we will do a formal contract of our company to you, it will have the product name, trademark, model, manufacturer, quantity, amount, delivery time, installation, warranty, etc that you need.
 
Q: How long is delivery time?
A: Without special customization, normally delivery time is when we receive the deposit 7-10 days arrange delivery. If in busy situation need 15 to 20 days.
 
Q: What is the payment method?
A: 40% deposit in advance, 60% one-time pay off before shipment.
 
Q: If buy your machinery, will you arrange personnel to teach us?
A: yes, if you need, we will send debugging personnel to give you installation and debugging and coaching.
 
Q: Installation, maintenance spare parts Aare broken, how to deal with?
A: Equipment warranty for one year, within one year parts is broken, quality problem can return to our company for maintenance, and we will send to you in the fastest way. Don't delay your production.

Related Products

Message

code